Event-day gates 2026-09-23: WuXi Answer still unread, two still-nos, MU still dated
Wednesday check. CourtListener still lists ECF 29 Answer (18 Sep); RECAP PDF still 404. FERC has not ordered ER26-3380; next gate Sep 29. No named outside 18A HVM logic order. Micron Q4 FY26 call remains Sep 30 2:30 p.m. MT.
Event-day gates 2026-09-23: WuXi Answer still unread, two still-nos, MU still dated
Generated by Grok Bot research on 2026-09-23. Parallel-deep-research + native X. Treat as raw material — review before promoting into a project or thread.
Summary
Same three dated gates as Tuesday, plus Micron still dated. CourtListener docket 73471030 still lists ECF 29 Answer (18 Sep); this morning's RECAP PDF fetch returned HTTP 404. FERC has not issued an order on ER26-3380; PJM still asks the Commission to act by 29 September so the procurement window can open 30 September. No named outside high-volume 18A logic order overnight. Micron's IR notice still sets the fiscal fourth-quarter call for Wednesday, September 30, 2026, at 2:30 p.m. Mountain time. None of these is a conversion. Do not re-date TMO, CEG, INTC, or MU.
Findings
WuXi / BIOSECURE — ECF 29 Answer remains on the public docket; body still unread
CourtListener docket 73471030 still lists ECF 29, dated September 18, 2026: "ANSWER to Complaint by MICHAEL CADENAZZI, STEVE FEINBERG, PETE HEGSETH, U.S. DEPARTMENT OF DEFENSE.(Jankowski, William)."
This morning's fetch of https://storage.courtlistener.com/recap/gov.uscourts.dcd.293402/gov.uscourts.dcd.293402.29.0.pdf returned HTTP 404. The Answer body is still not in RECAP. The August 7 preliminary injunction against giving effect to the 1260H designation remains the last merits order. An unread Answer is not a 2026 realized mAb fill-finish price series. Keep the Western-CDMO contradiction as a human call. Do not re-date TMO.
FERC ER26-3380 — still no order; Sep 29 remains the requested gate
PJM's July 31, 2026 ER26-3380 transmittal still asks the Commission to issue an order, and make the proposal effective, by no later than September 29, 2026. The same filing states the RBP procurement window opens if and when a Commission order accepts the framework, and that PJM intends to open the window on September 30, 2026 if accepted by September 29. PJM's August 28 execution deck still labels the FERC order "anticipated" and the September 30 window contingent on approval. Overnight search did not surface a Commission order accepting or denying ER26-3380. Silence is not a ruling. Do not re-rate or re-date CEG.
Intel 18A — still no named outside HVM logic order
No primary IR or customer release overnight names an outside high-volume logic foundry order on 18A. Independent recaps still treat Microsoft Maia, AWS framework, Apple 18A-P kit, and Terafab as engagements, not named HVM wafer starts. Fortinet on Intel 4 remains the wrong node. Socionext 18A-P remains ecosystem. October PDK 0.9 remains the dated test. Do not re-rate INTC.
Micron Q4 FY26 — print still dated September 30
Micron's IR notice (GlobeNewswire, August 26) still sets the fiscal fourth-quarter earnings call for Wednesday, September 30, 2026, at 2:30 p.m. Mountain time, webcast at investors.micron.com. It is not a print. Do not re-rate MU.
Contradictions and open questions
- ECF 29 without a readable PDF is not the Western-CDMO price series. Human call remains open (31st weekday).
- FERC could still order ER26-3380 on or before September 29; silence today does not move the gate.
- A named 18A HVM logic order would be the conversion; none appeared overnight.
- Micron's print on September 30 can move the HBM/DRAM chain; today's silence is not that print.
What this is not
- Not a conversion of the Western-CDMO thesis.
- Not a FERC order. Next gate September 29.
- Not an 18A HVM purchase order.
- Not a reason to mint a thirty-first weekday of net-new AI-infrastructure chains.
Provenance
Method: Grok Bot / parallel-deep-research / native X Generated: 2026-09-23
Web sources:
- CourtListener WuXi AppTec v. DoD docket — ECF 29 Answer listed 18 Sep; last merits order remains Aug 7 PI
- RECAP PDF for ECF 29 — HTTP 404 this morning; body unread
- PJM ER26-3380 July 31 transmittal — requested order by Sep 29; window Sep 30 if accepted
- PJM Reliability Backstop Procurement Execution deck — FERC order still labeled anticipated / contingent
- GlobeNewswire Micron Q4 call — call still Sep 30 2:30 p.m. MT
X sources:
- none found
Grokipedia:
- not used